V4 Alpine Plank Flooring - Glade Oak - 190mm
Live flooring prices
Sign in to view pack and square metre pricing
Create a free customer account or sign in to see live prices, choose your pack or sample and use the flooring calculator.
Trade customer? Sign in to view your trade pricing. Apply for a trade account
Flooring delivery Usually 3–5 working days, subject to stock FREE
Flooring Click & Collect Usually ready in 3–5 working days FREE
Glade Oak has a smooth, clean-lined appearance, with a matt lacquer protecting the natural rustic grain and variation beneath.
The CD Rustic Oak surface is matt UV-lacquered. This three-layer engineered floor uses a 3mm oak top layer. Boards measure 14mm × 190mm × 1900mm. Each pack covers 2.166m². It has tongue-and-groove joints and micro-bevels on all four sides, and can be floated or fully bonded.
Product specification
| Product code | A110 |
|---|---|
| Selected floor | V4 Alpine Plank Flooring - Glade Oak - 190mm |
| Format | Plank |
| Construction | Engineered |
| Timber | Oak |
| Grade | Rustic |
| Pack coverage | 2.166m² per full pack |
| Price basis | Sold by the full pack, including VAT; equivalent price per square metre shown |
| Technical data | View the V4 technical data sheet |
Natural timber and grading
Grading describes appearance rather than quality. Natural timber varies from board to board, so differences in tone, grain, knots, filler, sapwood and surface texture should be expected.
Wiltshire Wood Flooring Supplies advice
Protect the factory lacquer on Alpine Glade Oak with felt pads and a suitable lacquered-floor cleaner.
-
ConstructionEngineered
-
Flooring formatPlank
-
Timber speciesOak
-
GradeRustic
-
Finish typeLacquered
-
Colour toneMedium
-
Colour familyNatural
-
Surface characterSmooth
-
Edge profileBevelled
-
Thickness14 mm
-
Board width190 mm
-
Wear layer3 mm
-
Length typeFixed Length
-
Underfloor heatingYes
-
Pack coverage (m²)
These product-specific instructions summarise the current V4 How to Install Engineered Wood Flooring and V4 UFH guidance requirements. Fitting should be completed by an experienced wood-floor installer.
Before delivery and acclimatisation
- Use an experienced wood-floor fitter and complete all wet trades before delivery.
- Maintain approximately 18–24°C and 45–65% relative humidity before, during and after fitting.
- Store engineered boards sealed and flat in the fitting room for at least three days; solid boards require at least seven days.
Subfloor preparation and moisture
- The subfloor must be sound, clean, dry and free of paint, plaster, oil, dust and movement.
- Check flatness with a 2 m straightedge. Variation must not exceed 3 mm; level high or low areas before fitting.
- Measure and record subfloor moisture with the correct calibrated meter. Apply a compatible surface damp-proof membrane where readings or construction require it.
- Secure loose timber subfloors, countersink fixings and overlay uneven boards with suitable flooring-grade plywood without aligning joints.
- For full bonding, mineral subfloors must be below 65% RH; timber subfloors should not exceed 11% and should be within 2% of the flooring.
For more detail, read our engineered-floor subfloor preparation guide.
For boarded or suspended bases, read our timber subfloor preparation guide.
Fitting this floor
- Required method for this product: Fully bond or float using the correct joint adhesive and underlay; full bond is preferred over underfloor heating.
- For a floated tongue-and-groove floor, use the correct underlay and a continuous bead of D3 joint adhesive in both long and end grooves; do not spot-glue joints.
- For a bonded floor, use a compatible permanently flexible wood-floor adhesive and the specified notched trowel, checking adhesive transfer as work proceeds.
- Lay from at least three packs, inspect every board in good light and reject visible defects before fixing.
- Stagger end joints by at least 200 mm and avoid a repeating brick-bond pattern.
Use a system appropriate to the site and read our wood-floor adhesive guide.
Expansion, inspection and completion
- Provide at least a 15 mm perimeter gap (or the larger manufacturer-calculated allowance) at walls, door frames, pipes, hearths and fixed obstructions.
- Use movement breaks between rooms and wherever the manufacturer’s maximum uninterrupted span would be exceeded.
- Allow for cutting waste, grading and natural variation; mix boards across packs before fixing.
- Stop and contact Wiltshire Wood Flooring Supplies before fitting if the product, subfloor, site readings or proposed method do not match these requirements.
Compatibility
This engineered V4 Wood Flooring floor is compatible with underfloor heating when the complete system is prepared and operated exactly as specified below.
Before installation
- Confirm that the flooring, UFH system, screed, controls, adhesive and underlay are mutually compatible before delivery.
- Commission, test and document the complete heating system before flooring is installed; repair screed cracks and hot or cold spots first.
- Measure and record the subfloor moisture at the correct test points. Do not fit until it meets both the floor and adhesive manufacturer’s limits.
- Maintain stable room humidity and use floor-temperature sensing. Rugs and furniture can create local heat build-up.
For low-profile systems, also read our UFH tray and overlay preparation guide.
Heating procedure and temperature limits
- Engineered V4 floors are compatible; solid V4 floors are not. Full bonding is preferred wherever the system and subfloor allow.
- The temperature at the wood surface, including beneath rugs, must never exceed 27°C.
- Electric heating mats must be encapsulated beneath at least 5 mm of fibre-reinforced smoothing compound; wood must never contact a loose mat directly.
- Keep the heating off during fitting and for 48 hours afterwards, then raise the temperature by no more than 1°C per day.
- Avoid sudden thermostat changes and maintain approximately 45–65% relative humidity in service.
Important
- Keep the commissioning, moisture and temperature records with the installation paperwork.
- Do not fit if the UFH supplier, adhesive supplier and flooring requirements conflict; obtain a written project specification first.
- Contact Wiltshire Wood Flooring Supplies before installation if any system detail or measured condition is uncertain.
